Blossom Ko

About Blossom Ko

Blossom Ko is Operations Manager for AirLoom Energy, a start-up wind energy company located in Laramie, WY at the University of Wyoming technology incubator. She has been with the company since its inception, and brings over 15 years of operations, administration and finance experience to the team.

AirLoom Energy On Track to Replace Wind Turbine Using Simulation

AirLoom Energy (from left to right): Mookwon Seo (engineer), Olivia Lim (engineer), Robert Lumley (president), Blossom Ko (operations). Additional staff (not pictured): Lance Goode (systems administrator), Josh Hamblin (engineer)

AirLoom Energy (from left to right): Mookwon Seo (engineer), Olivia Lim (engineer), Robert Lumley (president), Blossom Ko (operations). Additional staff (not pictured): Lance Goode (systems administrator), Josh Hamblin (engineer)

Breakthrough energy innovation comes in many forms, as we at AirLoom Energy are proving with our revolutionary design of an alternative to the wind turbine. AirLoom Energy is a startup wind energy company housed at the incubator program (WTBC) at the University of Wyoming, home of the Cowboys football team and big, BIG wind. We were recently awarded an SBIR grant from the National Science Foundation to support the prototype development of our novel AirLoom wind power generation technology, a milestone that can be credited in large part to support received through the ANSYS Startup program. Continue reading